Case Study: Boeing 787 Lithium Ion Battery Project

CLASS/THEME: “PROJECT MANAGEMENT IN AVIATION”

A) Develop a 2 page document ( APA FORMAT) providing an analysis and conclusion section of went went wrong with the Boeing 787 Lithium Ion Battery Project failure.

B) How the problem may have originated in the initiation phase of the project.

**** Please address the following sections in the case study:
1) How does the project failure relate to the principles of the project management Iron Triangle and the project initiation phase?

2) What risks did Boeing fail to adequately address affecting the triangle balance?

3) Were there unknowns involved which contributed to the project failure?

4) CONCLUSION: Summarize why you believe such a prestigious aviation company experienced such a project failure. ****

RESOURCES:
Attached are images of the rubric and the link to the discussion of the presentation pertaining to the ” initiation phase of a project, within a project management environment. Also a youtube link which pertains to Project Management Triple Constraint. (( Please feel free to use these sources for personal use and to incorporate into the case study).

** Please include the Iron Triangle of Management and triple constraints as at least two of the references for this case study. **

LINKS:

https://study.com/academy/lesson/iron-triangle-of-project-management.html

https://www.youtube.com/watch?v=oBROVRnY7wk

*** Any questions, please feel free to reach out. Thank you! ***