Facility Emergency Plan (FEP) project

Individual Research Paper (20 points) (4 pages)
In this assignment, you are to conduct academic-level research and prepare a paper that will be the basis for the subsequent Facility Emergency Plan (FEP) project.

– I chose the commercial facilities sector as one of the DHS-designated critical infrastructure sectors – – The Silver Spring Civic Building

1.The first step is to become familiar with the DHS-designated critical infrastructure sectors and the process of developing a FEP.
2.The second step is to research and select one of the DHS-designated critical infrastructure sectors. Briefly explain why you chose this sector.
3.The third step is to research and select a facility that is part of the chosen critical infrastructure sector for which you intend to prepare a FEP. Describe, in some detail, the facility.
4.The fourth step is to research and collect information on the risk management process and identify a methodology for developing of a risk management strategy that you will use, in the FEP assignment, in assessing and managing risk associated with your selected facility. While you are not required to, you are encouraged to select the risk management process outlined in FEMA’s A How-To Guide to Mitigate Potential Terrorist Attacks Against Buildings (FEMA 452) and Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings (FEMA 426). Make sure to incorporate applicable laws, regulations, and guidelines on the federal, regional, state, tribal, local, or private sector that would apply to your selected facility.
5.The fifth step is to research, explore and identify a widely accepted risk assessment methodology, such as CARVER, that you will employ as part of the risk management process in the FEP assignment. The risk assessment methodology you select will be used to analyze the risks, i.e. consequences, vulnerabilities, as well as threats and hazards, for the chosen facility.

6.The six step is to research and identify potential threat protection and hazard mitigation measures that could be applied to your selected facility. When applying your selected risk management process to your selected facility in the FEP assignment, you will identify which, if any of the identified potential protection and mitigation measures, are appropriate to include in your FEP. The paper shall identify which specific stakeholder roles for potential threat protection and hazard mitigation measure.

Use the order calculator below and get started! Contact our live support team for any assistance or inquiry.

[order_calculator]