You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to deliver an information technology project plan in anticipation of the company locating to a new facility. Since this is a start-up company, there is currently no building or technology infrastructure to support the business. All information technology (hardware and software) must be implemented in either a hosted solution, on-site solution or a hybrid model. The CEO is expecting you to integrate different technologies from different partners and incorporate industry best practices in connection with the development of technological systems. The new facility is a two-story stand-alone building. The company currently consists of ten (10) employees with revenues of $5 million but is expected to grow to thirty (30) employees with revenue of $30 million over the next two (2) years.
This assignment consists of two (2) sections: a business requirements document and a Gantt chart or project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
Procuring quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured so that infrastructure and information systems can be designed properly. Using the requirements document provided in the course shell, you are to speculate on the needs of the company. You must consider current and future requirements; however, assumptions should be realistic and carefully considered.
Section 1: Business Requirements Document
1. Write an eight to ten (8-10) page original business requirements document for the project plan using the template provided. template attached docs.
a. Describe the project including the following:
i. Describe the scope and analyze how to control the scope.
ii. Identify possible risks, constraints, and assumptions.
iii. Describe the integration with other systems and infrastructure. Note: Database and interface design, security, and networking should be considered.
iv. Define relevant terms that will be used throughout project.
b. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Include a cover page containing the title of the assignment, the students name, the professors name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
Section 2: Revised Gantt Chart / Project Plan
Use Microsoft Project or an open source alternative, such as Open Project, to:
2.Create a Gantt chart or project plan (summary and detailed) template. The Gantt chart or project plan should:
a.Record all tasks, subtasks, resources, and time related to the project.
b.Outline the planning, analysis, design, and implementation phases.
c.Develop in accordance with the systems development life cycle (SDLC).